METKA S.A. is pleased to announce that the company has recently signed a new contract for the addition of heavy fuel oil operational capability at the Shat al Basra site in southern Iraq.
The main characteristics of this new project are as follows:
1.Project Owner:
Ministry of Electricity–Republic of Iraq
2.Project Scope:
The scope of the project includes the engineering, procurement and construction as required to enable operation of the Shat-Al-Basra Power Plant on heavy fuel oil, including related mechanical, electrical and civil works, as well as tie-ins to the existing in frastructure.
3.Project Location:
The project will be carried out at the existing Shat Al Basra Power Plant site in Basra Province, where the company is currently installing a 1,250 MW open cycle gas turbine power plant.
4.Contract Value:
Total amount 166.5 million dollars.
5.Project Time Schedule:
The project will be executed in 12 months from the contract effective date and the opening of a Letter of Credit.